The end wall is located on both sides of the entrance and exit, which plays the role of retaining soil and guiding water, and is the structure to ensure the stability of subgrade or embankment at culvert.
The splayed retaining wall is opened to ensure the stability and diversion of subgrade slopes on both sides of culvert or gravity abutment, so the end wall foundation is splayed wall foundation.