High-speed railway station is still under repair and is expected to be completed and open to traffic in 2022. The main structure of high-speed railway station in Xishuangbanna has been completed. At present, the model design of the ticket office and toilet platform and the external decoration of the station building are being carried out, and the finishing work of the eight bergamot-shaped steel structure on the decorative surface of the station building is also under way. After completion, joint debugging and testing will be carried out.
There is a train in Xishuangbanna, at Jinghong Railway Station. Xishuangbanna is located in the northern edge of the tropics and belongs to the tropical monsoon climate.
Related information introduction:
You can go to Xishuangbanna by train. Xishuangbanna Station is located in Xishuangbanna Dai Autonomous Prefecture, China, Mannuanlong Village, gasa town, Jinghong City, on the northwest side of Xining-Lancang Highway. It is the railway station under the jurisdiction of China Railway Kunming Bureau Group Co., Ltd. and the passenger station of China-Laos Kunwan Railway. Xishuangbanna Station started construction on April 30, 2020; 202 1 65438 was put into operation on February 3rd.
Reference to the above content: Baidu Encyclopedia-Xishuangbanna Station