What is the design of the sewer pipe in the bathroom? How to install the sewer pipe in the bathroom?

The sewer pipe in the bathroom is very important, which is related to the normal discharge of sewage in our future, so people will design it first when decorating. What is the design of the sewer pipe in the bathroom? This is a concern of many owners. Only when it is designed can it be installed normally. Therefore, we also need to know how to install the sewer pipe in the bathroom. As an important part of home life, people pay more and more attention to the decoration of the bathroom. The sewer pipe in the bathroom is very important, which is related to the normal discharge of sewage in our future, so people will design it first when decorating. What is the design of the sewer pipe in the bathroom? This is a concern of many owners. Only when it is designed can it be installed normally. Therefore, we also need to know how to install the sewer pipe in the bathroom.

What is the design of the sewer pipe in the bathroom?

1, the hot and cold water pipes in the bathroom should be separated and the distance should not be too close. The height of shower pipe is between1.8m-2.1m. For the installation of water pipes in toilets, generally, the water pipes are from the top to the ground, and the outlet of hot and cold water must be horizontal, generally, the left side is hot and the right side is cool, the pipe laying should be horizontal, vertical and firm, and the layout trend should be safe and reasonable. The position of pipe clamp and the slope of pipeline shall meet the specification requirements. All kinds of valves should be installed in correct and upright positions for easy use and maintenance.

Both cold water pipes and hot water pipes are plugged into the wall. Check the groove depth when slotting, and the hot and cold water pipes cannot be in the same groove. When installing the water inlet and outlet of the water heater, the water inlet valve and air inlet valve must be considered and installed in corresponding positions.

How to install the sewer pipe in the bathroom?

First, the bathroom water pipe installation, the general water pipe from the top to the ground, hot and cold water outlet must be horizontal, generally hot on the left and cool on the right, pipe laying should be horizontal, vertical and firm, and the layout should be safe and reasonable. The position of pipe clamp and the slope of pipeline shall meet the specification requirements. All kinds of valves should be installed in correct and upright positions for easy use and maintenance.

Second, hot and cold water pipes are embedded in the wall. Check the groove depth when slotting, and the hot and cold water pipes cannot be in the same groove. When installing the water inlet and outlet of the water heater, the water inlet valve and air inlet valve must be considered and installed in corresponding positions.

Three, water pipe installation matters needing attention:

1, inlet water should be equipped with indoor master valve, and water pipes and connecting fittings must be checked for damage, sand holes and cracks before installation. When installing kitchen and bathroom pipelines, the size of the pipeline leaving the wall should take into account the size of the wall tiles after pasting, that is, the thickness of the wall tiles should be considered in advance. In the wall and underground, use as few or no connectors as possible to reduce the hidden danger of leakage. Connectors should be installed firmly without leakage.

2. When designing water pipes, we should consider the installation position of washing machine faucet and the layout of launching. At the same time, pay attention to whether the location of the power socket is appropriate. Put the drum washing machine in the cupboard. Be sure to determine the size of the washing machine and kitchen cabinet in order to maintain a good water supply and discharge position. After waterway reconstruction, pipeline pressure test should be done, and the test pressure should be not less than 0.6MPa for 20-30 minutes.

3. The shower mixing valve is positioned right and left, installed in the middle of the bathtub (determine the size of the bathtub first), and the height is on the bathtub 150-200mm. The outlet of the jacuzzi is reserved according to the model. The hole spacing of the water mixing valve is generally kept at (concealed) 150mm and (exposed) 100mm, and the outlet position of the connecting rod shower should be determined according to the height of the room and the personal needs of the owner.

4. The water inlet and outlet of the toilet should be placed where it can be blocked by the toilet. One-piece toilet should be located at the outlet according to the model, and generally should be left at 200mm in the middle of the outlet of the toilet.

5. The height of the water supply port (elbow) reserved on the wall should be appropriate, and it should be easy to maintain. The hose should be exposed as little as possible, and no extra hose should be connected, giving people a simple and beautiful vision. For sanitary ware, if there is no cabinet under the column basin, the height of the reserved mouth should generally be about 500-600 mm on the ground. The lower outlet of column basin should be located in the center of column bottom or behind column, and cover it with column as far as possible. The drainage pipe of wall-hung washbasin (without column or cabinet) must be arranged horizontally with the elbow out of the wall (that is, the drainage pipe enters the wall).

What is the design of the sewer pipe in the bathroom? Sewer pipe is an important part of bathroom. It can be said that if there is no sewer pipe in the bathroom, there is no way to use it normally. Therefore, before the renovation, you can design how to place it and then install it in a targeted manner. How to install the sewer pipe in the bathroom is actually not difficult. As long as the design is good, we can let a professional master install it, so that the quality will be more guaranteed.