What are the emergency plans at the construction site?

1, comprehensive emergency plan

It is a comprehensive document to deal with all kinds of accidents by generally expounding the basic requirements and procedures such as emergency policies, emergency organizational structure and related emergency responsibilities, emergency actions, measures and guarantees.

2, special emergency plan

Plans or schemes formulated for specific accident categories, hazards and emergency support are an integral part of the comprehensive emergency plan, which should be formulated in accordance with the procedures and requirements of the emergency plan and serve as an annex to the comprehensive emergency plan. The special emergency plan should formulate clear rescue procedures and specific emergency rescue measures.

3, on-site disposal scheme

Emergency measures for specific devices, places or facilities and posts. The on-site disposal plan should be specific, simple and targeted. According to the risk assessment and risk control measures, the on-site disposal plan should be prepared one by one, so that the accident-related personnel can be familiar with it and master it skillfully, and respond quickly and correctly through emergency drills.

Extended data:

Construction site management elements

1, safety management

It is mainly about fire prevention, prohibition of disorderly wiring, wearing safety helmet, scaffolding, using safety belts and other corresponding construction safety issues. It is necessary to set up a special safety team, grasp and talk every day, train and learn more, and nip in the bud.

Construction site management is a systematic project, involving all levels of enterprise management and every operator in the construction site. Coupled with the characteristics of long production cycle and many external influencing factors, on-site management is more difficult.

2. Material management

Before the project starts, put forward a one-time plan to the material department of the enterprise as the basis for supply and preparation. During the construction, according to the consumption quota of building materials, engineering changes and adjusted construction budget, the material supply plan is put forward to the material department of the construction enterprise in time to ensure the material supply according to the actual demand.

3. Quality management

Engineering quality inspection generally adopts the combination of on-site production workers' self-inspection, mutual inspection and full-time inspection personnel, and its basis is the engineering construction acceptance specification, engineering construction technical operation specification and engineering quality inspection and evaluation standard adopted by the state or department.