Bridge hoisting construction scheme

At present, there are four kinds of bridge hoisting equipment.

1, large crawler crane installed precast beam (only applicable to dry small span);

2. Installation of precast beam by bridge erecting machine (only applicable to span less than 50m);

3. Installation of precast beam for single guide beam dragging and traversing facilities (only applicable to span less than 35 meters);

4. Install precast beam across pier with gantry crane (only applicable to span less than 50m).