Material preparation: two needles and a ball of wool
Operation preparation:
1, starting with 18 stitches, it is best to choose a softer thread, so that the woven upper is not so hard.
2. Add needles in the second row, and add a trocar when there is one needle left in the leftmost side of each row.
3, according to the size of the foot, generally speaking, 36 yards of shoes can be woven in 30 rows, but remember not to knit the first stitch in each row.
4. After weaving two layers of vamps, it is best to find some cloth and put it on the middle seam of the vamp, so that the wool vamp is not easy to go out of shape.
5. Just buy soles according to the size of your feet.
6. The vamp grows behind the feet and begins to weave the vamp.
7. A few stitches in the middle. The remaining stitches are evenly given to the surfaces of the two shoes, and the stitches near the soles are not collected. Each time the other side receives one stitch at the end of weaving, there are three stitches left.
8. Finally, the vamp and woven sole can be stitched.
9. Sew the thread and the woven vamp with a needle specially designed for the sole.
10, the thread must be tightened, and finally the threaded end is dialed.
1 1. Hide the thread so that the wool slippers are finished.