Dyson sphere plans to maximize mass production, and analyzes the detailed description of three-dimensional transportation and control line.

How does Dyson Sphere Plan maximize mass production? In fact, three-dimensional transportation and line control can be used, which some players may not understand. Let's take a look at the analysis of Dyson sphere maximization production plan.

Analysis on the Maximum Mass Production of Dyson Sphere Plan.

We should find that transportation line is the best choice in the process of maximizing output.

However, it is difficult to allocate transmission lines and there is no control means, which makes bus regulation more troublesome.

But there is a solution.

Points are as follows

1. The highest level of the circuit in the game is about 50, and the main reason why it cannot be manufactured beyond this range is that the building distance is not enough.

2. Except for the satellite power distribution station, all other power supply units are flat, and the flying height of the power distribution station is about 45.

2. Sorters, boxes and lines can all be layered (exclusive of making Rubik's Cube).

3. The sorter's logic is that if you want to take things out, you have to search up and take them out, and the same is true for putting things. This means that you can use superimposed boxes and transmission lines to make a control system.

Based on the above principles, three-dimensional traffic is divided into four layers.

1. Floor 0 is the entrance and exit of all goods, similar to high-speed entrance and exit.

2. floors 1, 3, 6, 9, 1 1 3, 17,19 (odd floors below 20) are controllable floors (boxes and sorting machines can be used).

Even floors 20-45 below 3-20 are partially controllable floors (sorters only).

4 40- Infinite? Uncontrollable layers can only be wired.

-

The following examples illustrate how to ensure the high upper limit of the bus and not get stuck under the condition of minimum floor space.

Iron ore is processed into ferromagnetic steel and used completely. Iron ore is easy to get stuck in actual processing as long as it is not separated, because there is no control system and only boxes can be used to maximize redundancy.

Separation takes up too much land, so it is necessary to ensure output and minimize land consumption.

Use control characteristics, where 0 layer is used for output and other layers are used for input.

There are three lines in the example, but the entrance is a line, which is mixed.

Because the logic is that when layer 0 outputs steel plates, it will search to the upper layer and take out the last suitable item.

The problem we often encounter is that it is extremely difficult to control the exact proportion because there is no control means.

At the same time, because things are everywhere, it is easy for a chain to collapse and it will all collapse.

If you do this, use a sorter to combine all the boxes with non-zero floors into a whole.

You will have a huge extra space.

The end result is that Layer 0 output gives you what a production line wants.

All floors 1-9 are combined into a super warehouse.

If a line needs something exclusive, make a transition zone.

For example, if a production line needs silicon blocks, then the second layer sorter in the exit area can only take what you want.

The concept of delay is to place a shuffled 10-level warehouse group in the warehouse group, and the logic is 2-3 groups, which are linked with each other to input all and output all, so as to disrupt the possible line congestion and slow down the production line congestion.

The best reason to use this method is

1. You can't guarantee a perfect consumption ratio for this game, because the supply of raw materials is not fixed (regardless of infinite resources).

Without accurate control system and destruction system, your production line will always be blocked in constant change.

3. To completely solve the congestion, only 1 line can only produce 1 thing, resulting in a significant decline in production efficiency.

So the advantage of this method is that

1. You don't need to control the exact proportion too much, just have a rough idea. The warehouse is big enough anyway.

2. Maximize productivity and minimize the probability of congestion. (Maximum land utilization rate)

3. More brainless ...

disadvantaged

1. It needs a lot of copying operations ... I want to die without blueprint function. ...

2. it is still possible to block, although the probability is low. ...

Positive input

Rear output

The boxes on the second floor are constantly changed to reduce congestion.