Accurate binding position
The location of binding and reinforcement (reinforcement type, molding size and reinforcement location) is accurate and firm, so that it will not be deformed due to vibration during concrete pouring;
Comply with the specifications and design requirements.
Binding joint, joint position, joint distribution rate, reinforcement spacing, anchorage length, etc. Comply with the specifications and design requirements.
Placement of protective layer cushion block
When binding steel bars, the protective layer pad must be placed according to the designed protective layer thickness, and bound firmly with steel bars, and shall not be displaced.
Eight-character buckle method
When binding steel bars, the method of "eight-character buckle" is generally adopted to ensure that steel bars are bound in place, and long iron wires should be thrown inside to prevent people from sticking or being exposed after pouring concrete;
Plum blossom binding method
When the flat plate is bound, the plum blossom binding method can be used for one-way plate, but there shall be no less than two fixed bindings around the edge of the plate, and both two-way plates shall be fixed.