Summary of installation methods of various sanitary wares in bathroom
NO 1: bathtub installation
Test for water leakage: before installing the bathtub, install the water fittings and turn off the water for 24 hours to see if the bathtub leaks, paying special attention to overflow.
Bathtub leveling: when placing the bathtub, pay attention to the other end of the drain pipe slightly higher than one end of the drain pipe, so that the sewage discharge will be poor in the future. The bathtub is visually pleasing without affecting the drainage effect.
Sand filling: Although the cast iron bathtub is strong, it conducts heat quickly. It should be used in sand and mashed at the bottom of the bathtub. Bubbles are also recommended. Considering that foam does not flow like river sand, it is suitable to fill all gaps. In the process of filling river sand, how to prevent sand from leaking into water pipes is an urgent problem.
Reservation, acceptance and repair: the outlet has a hole 300mm high and 400mm wide, and the port is selected according to the size. According to the size, cut out the waterproof board (thickness 40mm) and calculate it on the board. Fix the number and arrangement of bricks on the board with 903 structural adhesive. The edge of the brick is coated with sealant and placed on the box to facilitate the maintenance of the bathtub drainage system in the future.
NO2: Installing toilet seat
Take out the plug of the floor drain. After checking whether there are sundries in the pipeline, clean the pipeline around the pipeline outlet and aim the toilet outlet at the sewer pipe. Draw a mark on the hole of the toilet bolt and then remove the toilet.
Drill a hole with a diameter of 20mm and a depth of 60mm at the mark. Insert the bolt with the diameter of 10 mm into the hole and fix it with cement. Place the toilet eye on the bolt and match the mark. After the test, the toilet was removed. Apply putty around the toilet outlet and sewer pipe, then align the four bolt holes of the toilet horizontally with the bolts, put rubber pads on the bolts, and tighten the nuts properly.
Aim at the center of the back of the toilet, draw a vertical line, draw a horizontal line at a height of 800 mm from the ground, and draw a mark on the horizontal line according to the position of the holes on both sides. Behind the water tank, the diameter of the borehole is 30 mm. 70 mm hole. Insert a bolt with a diameter of 10 mm and a length of 100 mm into the hole and fix it with cement. Hang the rear water tank on the bolt and lay it flat. Especially aim at the center of the toilet. Put the rubber pad on the bolt and tighten the nut to fasten it.
When installing the elbow of the return water tank, first remove the nuts of the drain pipe of the return water tank and the entrance of the bathroom, then replace the elbow of the sewer pipe and put a rubber pad on the sewer pipe. Insert the upper end of the sewer elbow into the drain pipe of the rear water tank and the lower end into the toilet inlet, then push the rubber pad into the nozzle, tighten the nut, straighten the elbow and tighten it with pliers. Medium.
Installation method of cleaning various sanitary wares
When the splayed door is connected with water, first measure the size and distance of the floating door of the water tank, match the nipple, install the splayed door and put it into the water supply pipe. . To break the copper pipe or plastic pipe, the female lamp fork must be bent first, then the floating door and the opened door nut should be put back on the copper pipe or plastic pipe, and both ends of the oil-filled asbestos rope or lead oil hemp thread should be inserted into the porch of the floating door and the splayed door respectively and the nuts should be tightened.
NO3: Install the washbasin
Installation of washbasin: install washbasin, draw a vertical line according to the middle of sewer pipe, measure the height from the ground upwards, and draw a horizontal line on the wall. Draw a mark on the wall according to the width of the washbasin, and then make a hole with a diameter of120 mm. Insert the expansion bolt into the hole from the debris such as brick slag in the water slag flushing hole, crush it with cement, hang the thin tube frame, and put the rubber pad on the bolt, eye socket, nut and screw to reach the elastic tube end. The head is larger than the fixing hole of the washbasin. Put the washbasin on the shelf to find a flat surface, weld the bolt with a diameter of 4 mm on the horizontal iron bar, insert the upper end into the fixing hole, insert the lower end into the pipe rack, and then tighten the nut.
Install the cast iron frame washbasin, draw a vertical line according to the center of the sewer pipe, measure the height upward from the ground, draw a horizontal line above the horizontal line, and draw a mark above the horizontal line. To the width of the washbasin. Then draw a vertical line, put it into the basin frame, draw a screw hole with a diameter of 15 mm and a length of 70 mm in the hole, roll the wire into the hole and cut it into the hole. Fix the washstand on the wall with screws, put the washbasin on the stand, pull the latch of the movable stand, pull out the movable stand, and hook the stand in the basin hole. Internally, tighten the movable frame screws and adjust the alignment.
The installation method of sanitary ware is introduced here, but the study is also very good. I believe everyone will know more or less about the above contents, and I hope this article can help you. You can also log in to Tuba Rabbit to view and subscribe to more relevant content and information.
Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~