Clean the trunking. First of all, remove the sundries in the tank to ensure the cleanliness inside and outside the tank.
Pay-off first, let go and straighten the whole or small coil of wire to avoid curling. When conditions permit, you can put the straightened line on the pay-off rack and wind it into a big circle. The pay-off distance of home decoration is relatively short, so it can be paid off on the ground along the set trough plate. Put the trunk line first, then put the branch line.
Wiring. Cover the beginning with a slot cover, insert the cover directly on the slot, nail a slot cover on the slot, thread the incoming wire into the covered slot, and fix the rest while wiring and covering. Be careful not to hurt the wire when nailing the cement nail.
Wiring requirements. When laying and sorting, the wires should be straight, and there should be no extrusion, reverse buckle, kink and damage. Try not to tie wires. When binding is needed, nylon binding tape is used instead of metal wire. Wire connectors are not allowed in the trunking, and the connectors must be completed in the junction box. Just reserve 10cm~ 15cm in the junction box.