How to hang the tiles? What is the method of tiling?

Ceramic tile is a common material in the decoration process. There are different methods in the decoration and construction of ceramic tiles, so the method of hanging ceramic tiles is a common one. But during the construction, you should know the video tutorial of hanging tiles. Know the method to do the correct construction, but also know what is the method of tiling.

Video tutorial on tile hanging method

The point hanging method of ceramic tiles requires dry hanging, that is, the keel needs to be installed, and then the ceramic tiles are slotted and point hung.

1. Generally, the horizontal and vertical lines of tiles are divided on the wall, and then expansion screws are punched at the four corners of each tile about 5- 10 cm inward, and then the tiles and expansion screws are glued together with dry hanging glue. After the horizontal and vertical lines of ceramic tiles are adjusted, fix them with quick-drying stone glue.

2. The main flow of dry hanging construction technology of vitrified brick is: construction preparation, measuring and setting-out, steel frame installation, stainless steel tenon installation, granite tenon installation, slotting, vitrified brick sticking to vitrified brick installation, caulking and waxing.

What is the method of tiling?

1, foundation treatment

Before laying floor tiles, you need to carry out ground treatment and leveling, so that you can understand the slope of the ground and control the function of paving. Then, according to the above-ground area and tile ratio, the number of tiles used in each row and column is determined.

2, spread cement mortar

After the ground treatment, it is necessary to spread a layer of mortar on the ground, and the ratio of mortar to water is 3: 1, which constitutes a semi-dry layer. The appearance is filled with a shovel and a plastering knife, and the mortar thickness is generally 3-4 cm.

3, the shop is stuck evenly

After the mortar is leveled, apply the cement mortar diluted to 1: 1 on the back of the floor tile, and then spread it evenly on the ground paved with mortar in advance. After acknowledging that the floor tiles are evenly laid, the next operation can be carried out.

4. Trim the joint

Check the hollowing and flatness of floor tiles with a rubber hammer and a level gauge. After all the floor tiles have been laid and the patterns and lines are confirmed to be correct, the joint can be filled with joint sealant the next day.