Unit project: subgrade project (1-3km section)
Sub-project: Culverts and Passages (1-3km section)
Sub-project 1:No. 1 circular pipe culvert of this section.
Item: 1, culvert as a whole
2. Culvert fabrication
3, pipe socket and culvert installation
4. One-character wall and eight-character wall
5. Tapered slope
Sub-project 2: The second round pipe culvert of this section.
Item: 1, culvert as a whole
2. Culvert fabrication
3, pipe socket and culvert installation
4. One-character wall and eight-character wall
5. Tapered slope
. . . . .