2. Pay attention to the texture of the stone when installing, and try to keep the color consistent and the texture coherent. After installation, the aesthetics of the elevator door cover will be the best.
3. Carefully measure when threading. Not only a door cover should be vertical and flat, but also these problems should be paid attention to between each door cover.
4. When installing the side plates and wires, ensure that there are at least 2 pendants as supports. The position of angle steel should be measured accurately, and a reinforcement point should be added in the middle. This is done to make the doorjamb more stable and firm.
5. When installing the elevator door cover, don't get too close, reserve a position of 5mm to 8mm on the edge of the elevator door frame, and pay attention to keeping the reserved position around the elevator door cover consistent.
6. When installing the elevator sill, the floor tile and the elevator door frame should have a slope of about 3mm, and the door frame and the top stone should have a slope of about 2 mm. ..
7. The angle between the top line and the side line is 45 degrees. Contact angle should be tight and smooth, and no glue should be left in the gap during construction. If there is excess glue, clean it up in time, and then treat it with jointing agent. The line size is consistent, and the shape is steady, which is consistent with the overall style.
8. After using marble glue, fix it with special AB glue, which can ensure stability.
9. After all the elevator door covers are installed, color matching and jointing should be done well even if the site cleaning work is carried out. Also pay attention to the protection of stone external corners, and wrap them with foam corner protectors. This can avoid being damaged by collision.