Hello, Line 3 is the first Y-shaped subway in China. Its design is from the airport north to Panyu Square as the main line, and from Tixi to Tianke as the branch line. But from the beginning, Tixi The line from Tixi to East Station is operated as a branch line, so people think that the line from Tixi to East Station is a branch line. (Even the subway company is used to calling it a branch line)
In the future, the line from Tixi to Tianke will be operated separately from the main line, and will be extended from Tixi to Dongsha in Fangcun, Liwan District, and will be designated as the Guangzhou Metro Line 10, named Dongsha Line. When Line 10 is opened, Line 9 will be used as a new branch line of Line 3, with Gaozeng as the transfer station to the airport. By then, people traveling from Huadu District to Guangzhou will no longer have to use Gaozeng. Transfer.