Application Report for Rural Road Construction

Rural road construction application report sample (general 8 articles)

As people’s own quality improves, reports are no stranger to us. Usually, the content of the report is large , longer in length. So how is a general report written? Below is a sample rural road construction application report that I compiled. I hope it can help everyone.

Rural Road Construction Application Report 1

Dear leaders of the xx Village Branch:

With the improvement of people’s living standards, the original roads of our group have been It cannot meet the villagers' living and travel needs

. At present, the main access road for our group of villagers is bumpy and low-lying. It is always covered with dust on sunny days and covered with mud on rainy days. It has seriously polluted the environment, affected the health of the villagers, and also caused problems for the elderly and children. It has a serious impact. Every rainy day, children have to walk in the mud to go to school. The young ones can only stagger around with the help of grandparents who are steady on their own. If they are not careful, the elderly and children They are all covered in mud, and may even be injured accidentally. For many years, villagers have hoped to build a cement road based on the original main access road, but they have not been able to do so. Seeing that the party and the government’s series of policies to benefit the people, neighboring villages and groups have built cement roads. However, the villagers have very strong opinions on the fact that our group has not had a decent way in and out for a long time. People can’t figure out: Why only Is it so difficult for our group to build a cement road? The villagers are very sad about this. Whenever people discuss this matter, the villagers always ask repeatedly: The current policy is good, why can’t it benefit us? It can be seen that the villagers How strong is the urgency and ardent expectation for road construction!

But we still believe that the village and branch leaders will definitely understand our sufferings and urgent needs, will definitely be sympathetic to the villagers, and will definitely In the spirit of doing good things for the people, build a safe road for our group that is convenient for people to travel and for children to go to school!

Sincerely,

Salute!

Applicant :xx

20xx Rural Road Construction Application Report on xx, xx, 20xx

Dear xxx,

As the saying goes, "If you want to be rich, you must first Build roads. “Roads are the arteries of economic development. Accelerating the construction of rural road networks is of great strategic significance for promoting regional economic development, improving farmers' living standards, and improving rural consumption. With the formation of backbone lines such as national highways, provincial highways, and municipal highways, the importance and necessity of rural road construction has become increasingly prominent. Rural roads are one of the public infrastructures most directly related to rural areas, agriculture and farmers. They are important for prospering the rural economy, promoting rural social progress, realizing agricultural modernization, accelerating urbanization in rural areas, facilitating farmers' work, and broadening their horizons. It plays an important role and is of great significance.

At present, the municipal government is vigorously supporting and helping our village to build the xxx road. The residents of the village are deeply grateful. Whether they are elderly people in their twilight years, young people with high spirits, or innocent children, All of them lamented that they have embarked on the road of building a new rural area with a harmonious society. The xxx road parallel to this road is about xxx meters long and xxx meters wide. Over the years, it has also been an important road for farmers and villagers to work hard and transport. However, this road has not been repaired for many years. For a long time, the road surface has been bumpy and the roadbed is low. During rainy and snowy weather, the road accumulates water and becomes muddy everywhere. It is often covered with soil on sunny days and mud on rainy days. It seriously affects the sowing and harvesting of crops, and restricts the transportation of agricultural supplies and goods. In recent years, many young people have chosen to go out to work. Old people with yellow hair hanging down in buns are often left at home to watch over the children going to school. In rainy and snowy weather, it is very inconvenient for children, the elderly or pedestrians to walk and they need to be careful. In addition, a Three Gorges resettlement family settled next to this road. According to the relevant policies of the Three Gorges resettlement, we hope and believe that the municipal government will work hard to help implement the "five connections" (water, electricity, roads, closed-circuit television, and telephone). )policy.

If this road can be built successfully, it will not only help the Three Gorges immigrants realize their wish of a good road leading to their doorsteps. Every family in the village will enjoy such a convenient, comfortable and happy life, and their hearts will definitely be filled with happiness. Infinitely grateful!

In ancient times, Yanhuang cut off thorns, Yao, Shun, and Yu Tang stepped out of the path, and later the First Emperor opened up roads. It can be seen that road building has been a virtue since ancient times. The majority of residents in our village and all other villagers Likewise, catching up with the construction of a harmonious socialist society, we believe that with the care of the party and the government, leaders at all levels will build a path for our village for the common people with the care of the party and the government. A convenient road for travel and a safe road for children to go to school! We villagers will be as grateful as ever to be able to bathe in this infinite and harmonious sunshine!

Sincerely

Salute!

Applicant: xx

Rural Road Construction Application Report 3 on xx, xx, 20xx

Dear Changsha Municipal People’s Government:

This The village currently has a population of nearly 100 households. Since the establishment of the village for hundreds of years, the people of Qianjian Village have been law-abiding and diligent in farming. However, for many years, people in the Qiaodang Shang Group and Gaoyepo Group have been trapped on rugged, winding, potholed and dusty mountain roads, making it difficult for people and vehicles to get in and out. This year, due to heavy rains, the road into the village has been seriously damaged, making it even more difficult to get in and out of the village. It has brought inconvenience to the production and life of the people in the Qiaodangshang Group and Gaoyepo Group, and there are many safety hazards. The poor access to the village has seriously restricted the economic development of the Qiaodangshang Group and Gaoyepo Group. As the saying goes: "The road leads to wealth." Smooth roads are the basic hardware for economic development and improving people's quality of life. Due to the collective financial difficulties of our village and lack of funds for road construction, we sincerely request the Changsha Municipal People's Government to provide financial support.

1. The necessity of road construction The roads to be reconstructed this time are the Qiaodang Shang Group and Gaoyepo Group roads, with a total length of more than one kilometer. At present, the entire village's people's entry and exit, the export of agricultural products, and the export of bambooware all pass through this road. However, this road can only pass motorcycles and small agricultural tricycles, which seriously hinders the output of village products. Our village has more than 100 acres of paddy fields, 100 acres of vegetable soil, more than 1,000 acres of mountainous trees, and the rest is uncultivated. After the reform and opening up, the village's resources have been developed and utilized, and the people's living standards have continued to improve. However, road construction in Jinshanyinshan is the backing. Because the roads are narrow, rugged, and muddy in rainy days, it directly affects the transportation of production materials and products, increases production costs, and seriously affects the villagers' enthusiasm for production and further development. After the road is repaired, the transportation environment will be improved. Once production costs are reduced, young people working outside the area will come back to invest in development, which will greatly stimulate the rapid development of the planting industry, the economic main body of the Qiaodang Shang Group and Gaoyepo Group. The "Outline of the Eleventh Five-Year Plan for National Economic and Social Development" points out the construction of a new socialist countryside, strengthening rural infrastructure construction, focusing on solving the problem of difficult travel in rural areas, and strengthening rural highway construction. Nowadays, several neighboring villages (Wangsheng Village, Matang Village·) have built cement roads. Watching the surrounding villages take the pace of new rural construction and becoming well-off. Changing the backward traffic situation has become the unanimous voice of the people of the Qiaodangshang Group and Gaoyepo Group. At present, the enthusiasm of the whole group for road construction is high, and starting road construction and raising funds have become the common aspiration of the whole village and an urgent project

2. Construction content and scale (1) According to our Based on the number of people in the village, the economic status and the output of village products, the specifications of the roads expected to be rebuilt in our village are: the total road length is more than 1 km, the road bed width is 4.5m, the road surface width is 3.8.0m, and the road thickness is 20cm. The road surface is cement concrete

3. Construction location and construction time Construction location: Roads in Qiaodang Shang Group and Gaoyepo Group. Estimated construction time: June xx to January xx.

4. Organize the masses In order to improve the backward traffic conditions of the Qiaodang Shang Group and Gaoyepo Group as soon as possible and ensure the smooth progress of the reconstruction of the road into the village, the village established a "Village Road Reconstruction Team" specifically for this project Responsible for the reconstruction of village roads. to ensure the smooth progress of reconstruction.

5. Budget estimate and fund raising Reconstruction budget estimate: Based on market construction material prices and labor prices, the initial estimate of reconstruction funding is 442,500 yuan, due to difficulty in financing. We sincerely request the Dingzi Town People's Government to support the preparation of 442,500 yuan in funds. The roads in the Qiaodang Shang Group and Gao Yepo Group should be built as soon as possible to solve the traffic inconvenience problem for the whole village and help the Qiaodang Shang Group and Gao Yepo Group move toward a new socialist countryside.

6. Benefit Summary At present, a large amount of agricultural products and bamboo utensils cannot be transported out of the village, and the villagers' lives cannot be carried out normally. Some young and middle-aged people in the village go out to work, and the village is in short supply of labor. Villagers are less motivated to work, and it is inconvenient for primary school students to go to school. If the village road is repaired, the transportation environment will be improved, and all the above problems will be solved at the same time. This civilized ancient village will once again shine brightly on the road to the new socialist countryside.

Applicant: xxx

Person in charge: xx

Rural Road Construction Application Report 4 on x, month x, 20xx

Ningde Municipal Finance Bureau:

I am a natural village in Kengbian under the jurisdiction of the Shuyang Brigade in Xiping, Fu'an. It has a population of more than a hundred. However, due to the old roads in the village not being repaired for a long time and the erosion of mountain torrents, The original weak roadbed was damaged again, forcing our villagers to rebuild part of the roadbed in the village. They also wanted to use this road construction season to harden the road with cement to bring convenience to the villagers' lives, but there was no such thing in the village. Publicly owned assets and funds, so the required funds must be borne by the villagers themselves. However, the estimated funds for road construction this time are 90,000 to 100,000. Our villagers spontaneously raised 26,000 yuan. Currently, we are facing a shortage of funds for road construction, which is very difficult. Now I sincerely ask the leaders to provide strong support to benefit our villagers, so that our village can accelerate the construction and development of a new socialist countryside. The people of our village will be grateful to the leaders.

Salute

Applicant: xxx

Rural Road Construction Application Report 5 on x month x, 20xx

Xingliu Town People’s Government:

Xiaoyangzhuang Natural Village is located in Yingquan, Fuyang City County Located in the south of Dazhou Administrative Village, Xingliu Town, 400 meters south of the Shaosu section of County Road 023, the village has 46 households and a population of 230. There are more than 260 acres of fertile farmland in front of the village. The land is fertile and flat. It has been included in the construction plan of Huanghuaihai Economic Development Zone in Fuyang City. There is an east-west road 4 meters wide and 330 meters long adjacent to the village in front of the village. Direct access to the village central primary school. However, the road is bumpy and has a low-lying roadbed. Every time it rains or snows, the road accumulates water and becomes muddy. It is always covered with dirt on sunny days and mud on rainy days. It seriously affects the sowing and harvesting of crops, and restricts the transportation of agricultural supplies and goods. Children can only step on the mud with one foot deep and one shallow when going to school. If they are not careful, they will fall and be covered in mud. For many years, people have hoped to build a road for production and living, but they have not been able to do so.

Now, our village is included in the Huanghuaihai Economic Development Plan, and the people are eagerly looking forward to building roads, hoping that leaders at all levels will take this "east wind" to build a farmland for our village to increase production and income. , a safe road that is convenient for people to travel and safe for children to go to school! Hereby apply!

Dazhou Village Committee of Xingliu Town

20xx.3.6 Rural Road Construction Application Report Part 6

Our Nabai Group is located 1 kilometer west of the Shangguan Town Government, with 72 households and a population of 314. The total length of the entrance road is 1,600 meters. This road has a narrow road surface and a high fort, so only horse-drawn carriages or motorized tricycles can pass through. Every time it rains or snows, water accumulates in pools and becomes muddy. It is always covered in soil on sunny days and mud on rainy days, which seriously affects the sowing and harvesting of crops, and restricts the transportation of agricultural materials and goods. In recent years, all the young and middle-aged workers in our group have gone out to work, leaving only the old, weak, sick and disabled at home to take care of their children in school. Every rainy day, the older children can still walk one foot deep and one shallow in the mud to go to school, but the younger ones can only stagger along with the support of their elderly grandparents?

Materials for building houses in the group can only be transported by horse-drawn carriages or motorized tricycles in today's modern world, and the transfer fees are very high. Building an ordinary house requires several thousand yuan in transfer fees.

Moreover, our group is the main producing area of ??Shangguan high-quality June plums and the brand image of Shangguan high-quality June plums. Every year from June to July, many merchants come here to make purchases. At the same time, our group also develops the cultivation of tomatoes, ginger, etc. The inconvenience of transportation has caused great obstacles to the development and construction of the group. However, this dirt road has been there for decades. Every time it rains or snows, the road is so muddy that it is impassable. Vehicles cannot get in or out, and even motorcycles cannot ride. The hardening of this road has always been the dream of the people in my group. After much planning, on the first day of the first lunar month of last year, through a mass meeting, our group of people raised more than 100,000 yuan of their own funds, allocated their own land, hired their own excavators, hired their own labor, bought their own stone, sand and cement, divided the work into sections, and invested 1,000 yuan in work. Multiple.

Because the road fortress is high and large, the villagers can no longer afford to be injured. What the common people do on their own is just a drop in the bucket. Building roads has been a virtue since ancient times. The living standards of the people in our group are still in a state of poverty. We believe that with the vastness of China and the bright future of the world, the party and government must have the world in mind, care about the people, and understand our sufferings and urgent needs. We hope that government leaders at all levels, in the spirit of supporting "agriculture, rural areas and farmers", following the path of mass education activities, and doing good things for the people, will help us build a safe road for people to travel conveniently and for children to go to school with confidence! Help our group fulfill its long-cherished wish to build this road for many years! Looking forward to a solution!

Sincerely,

Salute!

xxx

Rural Road Construction Application Report 7 on x, month x, 20xx

Dear XX leader:

1. xxx Basic status of the village

xxx Village of xxx Township is located in Nangouli of xxx Township and is a deep mountain village. The village has 203 households and a population of 789. It has jurisdiction over 2 natural villages and 12 resident groups. The main source of income is farming and Mainly people work outside the village. The village is rich in natural resources and agricultural and forestry specialties. It is also a good place to develop eco-tourism. The primary problem is that the transportation facilities are backward. Most village roads are less than 3 meters wide and belong to the past mountain village dirt roads ( The trail) is uneven in the middle, full of rocks, and has steep curves and steep slopes. The standard is very low and it lacks necessary protective and drainage facilities. Especially during the rainy season, flash floods occur and most road sections are washed away, seriously affecting farmers' production, life and children's schooling.

2. Construction of rural roads

Faced with the traffic difficulties on xxx village roads, the township party committee and township government attach great importance to it. The main leaders of the township party and government and the leaders of the transportation department have visited the village many times. The on-site investigation of xxx village and the village cadres worked together to plan the construction of the village road. In 20XX, after planning and design by the transportation department, under the circumstances of the weak collective economy of the village and the difficulty of the township's financial funds, the whole village was mobilized to adopt a one-case-one-decision approach. The roadbed was built by raising labor. In order to build the cement road as soon as possible, with the strong support and help of the district transportation department, the village tried its best to build a 7.5-kilometer cement road, which not only solved the production and life problems of farmers, , also promoted the development of rural economy and laid a good foundation for the next development of rural tourism.

3. Content and scale of rural road construction

The total length of the rural road in xxx village is 7.5 kilometers. The design standard is a rural fourth-class road, with a roadbed of 4.5 meters, a road surface width of 3.5 meters, and a thickness of 3.5 meters. 0.15 meters, all made of cement concrete structure.

4. Investment in pavement hardening project

The total investment in building rural roads in xxx village is 1,221,858.00 yuan.

The details of the expenses are as follows:

1. 1,260 tons of cement × 400 yuan = 504,000.00 yuan 2. 3,074 cubic meters of sand : 225,000.00 yuan 5. Expansion joint slats and joint boards total 18,700.00 yuan 6. Health-preserving film: 12,500.00 yuan 7. Water truck freight: 18,500.00 yuan 8. Three-phase power line: 3,500.00 yuan 9. Electricity fee: 4,680.00 yuan 10. Machinery fee for roadbed construction: 15,000.00 yuan 11. Subsidy for roadbed widening, line modification, land occupation, and tree occupation: 15,400.00 yuan 12. Two-person shift, odd jobs: 19,250.00 yuan 13. Other expenses: 17,500.00 yuan 14. Total: 1,221,858.00 Yuan.

5. Instructions for applying for financial support

The total investment in road construction is 1,221,858.00 yuan. According to the matching funds of the national village-to-village project, each kilometer is 100,000 yuan, and 7.5 kilometers totals 750,000 yuan. Our village has a shortfall of 471,858.00 yuan.

Reasons for the lack of funds: First, the roadbed in our village is poor, with steep slopes, many curves, and long lines. Second, various raw materials have doubled compared with 20XX. Third, the prices of gasoline and diesel have increased, and vehicle freight has increased. Fourth, labor costs have generally increased this year. Fifth, our village was severely short of water, so we used two agricultural vehicles to haul water back to the Luanhe River 7 kilometers away. Based on the above reasons, the 7.5-kilometer project in our village has a funding gap of nearly 500,000 yuan. Due to the poor economic foundation of our village, the 1.2 kilometers that were hardened in 20XX still owes a loan of 39.800.00 yuan to *** Credit Union. Including this year's shortfall in funds, our village owes more than 500,000 yuan in foreign debt.

In view of the fact that xxx Village owes a lot of foreign debt due to the construction of rural cement roads and is in urgent need of payment, we are specifically applying to the district government to approve this fund application report to help our village solve part of the funds.

This is to report

District Land Management Center:

Xiaoyangzhuang Natural Village is located in the south of Dazhou Administrative Village, Xingliu Town, Yingquan District, Fuyang City County, 800 meters south of the Shaosu Section of County Road 023, with 46 households and 230 people in the village. people. There are more than 260 acres of fertile farmland in front of the village. The land is fertile and flat. It has been included in the land rectification and development plan of Xingliu Town, Fuyang City. There is an east-west road 4 meters wide and 700 meters long between the village front and the base. Direct access to the village central primary school. This production road divides the farmland of our village into two and is the only road for farmers to sow, manage and harvest crops in front of the village. However, the road is bumpy and has a low-lying roadbed. Every time it rains or snows, the road accumulates water in pools and becomes muddy. It is always covered with soil on sunny days and mud on rainy days, which seriously affects the sowing and harvesting of crops and restricts agricultural supplies. , Cargo transportation. At present, all the young and middle-aged workers in our village go out to work and silently contribute to the construction of the motherland in other places. Only the old, weak, sick and disabled are left at home to guard the farmland and take care of their children in school. Every rainy day, the older children still have to go to school. But I had to walk in the mud with one foot deep and the other shallow. I was so young that I had to support each other and stagger along with my grandparents who were both steady on their own. If I wasn't careful, both the elderly and children would fall and be covered in mud.

For many years, people have hoped to build a cement highway for daily life and production, but they have not been able to do so.

Seeing that the party's series of policies to benefit the people have led to the construction of cement roads in neighboring villages, people can't figure out: Why is our village the only one without a cement road? The people were very sad about this. Whenever people discussed this matter, the young people burst into tears and repeatedly asked: Now that the policy to benefit farmers is good, why can't we benefit from it? The young people were full of resentment and looked up to the sky and sighed: We go out to do construction work in other places every year, who will build a road for us to make it easier for our children to go to school? This shows how eager and eager the villagers are for road construction!

Now, the villagers are very dissatisfied with the fact that there has been no way in and out for a long time, and they are planning to petition collectively with dry food all day long. But we still believe that with a bright China, our party must have the world in mind and care about the villagers. The party and the government understand our sufferings and urgent needs. Leaders at all levels will, in the spirit of supporting "agriculture, rural areas and farmers" and doing good things for the people, take advantage of the "spring breeze" of the 10,000-acre farmland development plan to build a farmland for our village to increase production. Increase income, make traveling more convenient for people, and provide a safe way for children to go to school! Anxiously looking forward to the leader’s approval!

This report

Dazhou Village Party Branch, Xingliu Town

Dazhou Village Committee, Xingliu Town

June 20XX 8th;