Before factory decoration, a design plan is required. What is included in the design plan?

The factory building before renovation has been equipped with a lot of available power facilities. Therefore, it is necessary to carry out secondary renovation design of the factory decoration construction drawings. As a designer, it is necessary to understand in detail The original layout of the factory was based on the principles of "simple, clear and beautiful" to plan the layout of the new power facilities. In addition, during the design, problems found in the drawings were also contacted with the original design unit to make timely corrections so as not to affect the factory decoration. Renovation construction progress.

It is also very important that the designer communicates with the factory owner in advance to select a moving route to prevent the new power layout from affecting equipment transportation and thus production.

In the selection of decoration materials, procurement must be carried out in strict accordance with national standards and design drawing requirements, so as to compare products with others to ensure high quality and low price. The purchased equipment and materials must have factory certificates and inspection reports. After the materials arrive at the site, quality inspectors will work with professional and technical personnel to inspect the incoming materials, and unqualified materials will be discarded.

While carrying out the secondary renovation design, technical personnel must prepare a professional and detailed construction plan for explanation, clarify the construction preparations for each process, the protection of quality-standard finished products and other precautions, and provide written instructions to all parties on site. Professional construction personnel explain.