Carpenter's contract

Model contract for woodworking contract and material contract

With the passage of time, there are more and more types of contracts, and signing a contract can make both parties promise and perform cooperation in a standardized way. So the question is, how should we draft the contract? The following are contract samples of woodworking contractors and materials I collected for you. Welcome to read the collection.

Carpenter's Contract 1 Party A: _ _ _ (hereinafter referred to as Party A)

Party B: _ _ _ (Team Leader) (hereinafter referred to as Party B)

In order to complete the construction task with high speed, high quality and safety, starting from the clear responsibilities and rights, Party B and Party B hereby make this agreement in the form of contracting all woodworking parts:

A, woodworking team contracting scope:

(1) includes formwork multilayer boards, wood squares, nails, iron wires, wall-penetrating screws, water stop screws, gabions, PVC pipes for wall-penetrating screws, cement supports for concrete walls, release agents, wooden plugs and boards for cantilever channel steel bars, protective boards for people and goods elevators at all levels, manual and horizontal protective boards for elevator shafts, manual construction and construction of tower crane foundations and templates for construction elevators. Plate wall template positioning welding (electric welding machine and covered electrode cable), Rachel reinforcement and secondary structure reinforcement drilling, reserved hole template plugging after cantilever channel steel removal, project department construction personnel pay-off and elastic line, cable below the end, woodworking machines and tools and supporting wire switches, sun lamps and wires for overtime, shift workers' safety helmets and safety belts, and site cleaning and stacking. The formwork removal of all reinforced concrete structures and precast concrete members in this project, the formwork removal of reserved holes, etc. Safe and civilized construction sites, specifications and standard atlas and drawings of all woodworking work in the construction area. (2) All machinery and equipment used in woodworking. (3) The template of post-cast strip should be cleaned up. (4) The beam-slab column of the structure is treated with expansion formwork, and the post-cast strip is treated with chiseling. (5) Clean up the concrete leakage and slurry leakage caused by the formwork. (6) Formwork shuttering and formwork removal during concrete floor construction.

Second, the engineering quality requirements:

1. During the construction process, Party B must implement the mandatory provisions of engineering construction standards and building construction specifications to reach the qualified structural standards; If quality problems are caused and the acceptance criteria cannot be met, all economic losses (including labor, materials and construction period) caused by rework shall be borne by Party B, and a fine of 200- 1000 yuan/time shall be imposed according to the nature. Note: column leakage must be cleaned up, and it must be cleaned before formwork support. The first floor must be supported by new formwork. According to the requirements of the construction period of this project, two or more sets of formwork must be equipped to ensure the construction period. All concrete surfaces should be smooth, and the bottom of the beam should be arched according to regulations. The verticality deviation of column angle should be within 2mm, and there should be no missing edges and corners, which can meet the structural requirements of fair-faced concrete.

2, in the main structure shuttering, template construction, first by the team self-inspection, after the project department builder, inspector inspection, reported to the supervision company and the construction unit re-inspection qualified rear can be carried out.

Three, safety production management system requirements:

1. Party B's on-site construction personnel must hold valid ID cards, and those under the age of 18 or over 55 may not use them. All personnel entering the site must receive three-level pre-job safety education. Party B must actively cooperate with Party A's personnel management work, and the expenses for handling various certificates shall be borne by Party B. ..

2. When entering the construction site, you must wear a safety helmet, fasten the hat buckle, and fasten the safety belt for aerial work. Otherwise, 50 yuan will be punished.

3, special type of work must hold relevant certificates, put an end to irrelevant personnel into the construction site and living quarters, especially women and children, can't stay at the scene, offenders fined 200-500 yuan/person (women and children of this type of work shall be rented at their own expense).

4. It is forbidden to cook with fire in the living area. Otherwise, the apparatus will be confiscated and a fine of 100-200 yuan will be imposed. Each dormitory in the living area shall be occupied by the number of people designated by the project department, and each dormitory must be cleaned by a special person every day. All workers who stay at the construction site must abide by the dormitory rules and regulations formulated by the project department and must not turn on the lights during the day. All workers staying in the dormitory must return to the dormitory before 2 1, refuse to enter the construction site after 2 1, and turn off the lights at 22 o'clock in the evening.

5. Electric stoves, rice cookers, gas stoves, mosquito-repellent incense and other open flame facilities shall not be used in the dormitory. 200 yuan was fined for the first time and 500 yuan for the second time. In case of fire, Party B will take full responsibility.

6. In the process of construction, Party B shall bear all economic losses and criminal responsibilities for casualties caused by all operators of Party B's violation of safety production operation rules and non-compliance with safety production management system; Do not intentionally damage the property of the project department at the construction site. If it is found, it will be punished by one penalty and ten penalties. Fighting is strictly prohibited on the construction site. In case of a fight, the party concerned will punish 200 yuan/time, and the person in charge of Party B will punish 500 yuan/time. If the circumstances are serious, it shall be handed over to the public security organ for handling.

7, in the construction and living quarters are not allowed to pull disorderly wiring, this kind of' construction machinery must be equipped with protective devices, not in the scene and living quarters fire to keep warm, offenders will be fined 200 yuan/times.

Four, civilized construction site requirements:

1, this project must meet the standard of Bozhou safety and quality standardization demonstration site, and subcontracting of this project is strictly prohibited. The selected construction personnel should not only have technical quality, but also pay attention to moral quality. They should not use social idlers, especially those who have committed crimes, to enter the construction site. In case of violation, Party A has the right to contact relevant departments and hand them over to law enforcement departments for handling.

2. During the construction process, each working procedure must be cleaned after work, and the parts that need to be cleaned after work must be cleaned within four hours as notified by the project department, otherwise, the project department will send someone to clean up, and Party B will be detained for 220 yuan for each job. Construction machinery should be protected and maintained in time. Construction waste within the scope of this type of work should be removed from the site in time. If it is found that it is not dismantled in time, Party A has the right to find temporary workers to dismantle it, and the expenses will be deducted from Party B's output value at the time of settlement, and Party B will unconditionally implement it.

3. After Party B enters the site, the team leader should take care of his own workers, and all personnel are not allowed to defecate at will. Once found, it shall be ordered to make corrections, and undertake the sanitary cleaning of the whole building until the next person is reported, and a fine of 200-500 yuan will be imposed.

V. Project Price and Settlement Payment:

1. This project is settled in RMB/㎡ according to the construction drawings. (Party B's template transportation fee and depreciation fee are included in the contract fee). The quality and progress of Party B's project must be evaluated by the supervision unit and the construction unit, and Party B must pass the quality inspection at one time. Party B shall bear all expenses for rework.

2. Payment by installment:.

3. Party B must provide the payroll every time it receives the project payment, and the payroll shall be signed by the team's operators.

Six, quality, safety and civilized construction requirements:

1. installment payment, but when the amount of the construction unit is not in place, the living expenses of Party B's workers shall be paid by Party B. If Party B stops work due to insufficient living expenses, all losses (including construction progress, construction period and economic losses affecting various types of work) shall be borne by Party B. ..

2. Party B must ensure the turnover of materials and prepare enough labor according to Party A's construction progress plan, and shall not delay the construction period for any reason, such as economic difficulties, busy farming, holidays, illness, etc. Otherwise, all economic losses caused shall be borne by Party B (according to the weekly and monthly construction period set by Party A, a fine of 1 1,000 yuan will be imposed for each day of delay, and a fine of 20,000 yuan will be imposed for more than ten days of delay, and compensation will be made for the progress loss of each type of work).

3. Construction personnel entering the construction site shall go through the registration formalities and hand in a copy of their ID cards.

4. The project department meeting must be attended by the signatory and the person in charge. Without the consent of the project department, 500 yuan will not be punished directly. The contents of each meeting will serve as the relevant basis for the performance of the agreement, including various rectification instructions and progress requirements issued by the project, and will serve as an effective basis in case of disputes.

Seven. others

1. This Agreement shall be made in duplicate, one for Party A and one for Party B, and shall come into force after being signed and sealed by both parties.

2. For matters not covered in this contract, both parties shall sign a supplementary agreement through negotiation.

Signature of Party A:

Party B: Signature of Team Leader:

Address of contract signing:

Date of signing the contract: year month day.

Woodworking Contract 2 Party A's Contract:

Party B:

At present, under the principle of fairness and justice, there are projects to be constructed at Party A's site; On the basis of equality and mutual benefit, Party A and Party B, through consultation, hereby conclude the following terms and conditions, which are expected to be observed by both parties.

First, the way of contracting:

Party A will contract the project to Party B in the form of labor services and materials, and the settlement will be based on the construction area of RMB per square meter.

Second, Party B is responsible for the reconsideration of the main project and ancillary projects from the foundation platform to the factory building.

Third, the settlement method

Party A shall pay according to the progress of the project and complete the positive and negative projects according to the amount of each completed floor. 95% of the main acceptance project is completed, and the balance will be settled within one month after acceptance.

Fourth, the quality requirements:

Party B shall carry out the construction in strict accordance with the construction drawings and relevant construction specifications, and obey the management and deployment of the builder. In the process of construction, all expenses arising from material consumption or non-compliance with quality requirements shall be borne by Party B..

Five, civilized construction:

Party B shall carry out the construction in strict accordance with civilized construction standards, so as to ensure that people leave the site clearly. Playing cards, fighting, fighting and drinking are strictly prohibited on the construction site, otherwise the construction party has the right to fine.

Six, safety construction:

Party B shall carry out the construction in strict accordance with the relevant building construction safety standards, and all safety accidents that occur during the construction of Party B shall be classified into accident causes. If Party B fails to carry out the construction according to the safety standards, Party B shall bear the great responsibility of ensuring that the safety accidents are minimized.

Seven. This contract is made in triplicate, one for each party, and has the same legal effect after signing.

Party A (signature): Party B (signature)

date month year

;