1. Based on the electrical difference of rocks, the site is built under the condition of full space, which is different from the ground electrical method.
2. Electrical measurement is carried out in the underground roadway, and the underground current passes through the power supply electrodes arranged in the roadway to establish a full-space stable electric field in the rock strata around the roadway.