Each policy has a corresponding target, so it is recommended to call relevant departments to verify the reasons.
First, the compensation for land increase and decrease is based on the compensation scope, area calculation and compensation standard of farmers' housing in the old demolition area.
(1) The scope of compensation for the demolition of old houses includes: first, the main houses (including civil buildings, brick-wood structures and brick-concrete structures) bounded by external walls; The second is to damage productive houses such as houses, pens and flue-cured tobacco houses; The third is to burn cement dams, young crops and other attachments.
(two) the measurement of housing area should be calculated according to the area within the outer edge of the outer wall around the building. The construction area of two or more floors is calculated according to the number of floors, in which: the construction area with height ≥2 meters is calculated; The building area with a height of 1.4- 1.9 m is halved, and the building area is not calculated if the cornice height is less than 1.4 m, and the compensation will be made according to the structures.
(3) Compensation standard. Investigation on compensation standard of above-ground buildings, young crops and above-ground attachments based on physical indicators.
The increase or decrease of urban and rural construction land is mainly to tear down the old and build a new one, and effectively improve the living environment and village appearance of rural villagers.