2. Heat the fuser mold to about 20℃.
3. According to the installation requirements, cut the pipe with a pipe cutter.
4. Natural cooling.
5. Mark the depth of socket on the pipe.
6. After the construction is completed, it will be put into use after passing the pressure test acceptance.