The west, north and east axes of the foundation pit of building 0 1 adopt variable brace structure; Support replacement structure should be built in the south of (1-n) axis.
The length of the foundation pit from north to south is about 13 1m, and the width from east to west is about 86m.
A truss reinforced concrete horizontal support is set below the elevation of-1.7m. The supporting piles around the foundation pit are connected into a whole by the cover beam spanning the foundation pit through the splayed connecting beam of the inner column of the foundation pit.
Support replacement method
The underground two-story roof beam extending to the slope protection piles is used as the supporting replacement structure, and the width of supporting replacement is more than 3 times the pile spacing, and the supporting replacement block includes at least 3 supporting piles.