Workers in hydropower transformation are responsible for reserving the outlet position of water pipes and adding a plug at the outlet. The worker who installs the faucet, after unplugging the plug, connects it to the outlet pipe through the eight-character valve, and then connects it to the faucet through the eight-character valve and hose. This is the operation content of the faucet installer.