2. Secondly, remove the adjusting cover. For the temperature control valve, the temperature control valve is directly connected with the pipeline, and the pipe at the threaded joint of the pipeline needs to be cut before the temperature control valve can be removed.
3. After the valve is finally replaced, another PPR threaded joint can be welded and disassembled.