It is 17km downstream and 134km upstream of Danjiangkou Water Control Project. The project is mainly based on shipping, with comprehensive utilization functions such as power generation, irrigation, environmental improvement and tourism. The main works of the hub include 1 ton lock 1 seat, 20 20-hole sluices and power station 1 seat, with a total installed capacity of 90,000 kilowatts.