2. Grind and mark the insertion depth line to lay the foundation for the next casing.
3. Connect the casing to the specified depth with a welding machine.
4, calibration, to ensure that the pipe and pipe fittings on the same axis, put an end to offset.
5, when welding, ensure that the connection gap is neat.
6. Cooling: cooling to normal temperature to achieve compressive strength.