So that the final joint filling is dense. Tilting is to squeeze the brick and mortar under the top beam, and try to make the wall brick and beam closely connected to reduce the occurrence of cracks, but before painting, add a layer of steel wire mesh or glass fiber mesh at the intersection of the wall beam.
Function: mainly to prevent horizontal cracks from appearing at the bottom of wall beam.
The main practices are as follows:
1. Masonry works shall be laid to the top with a height of about 20cm. 7 days after the completion of masonry works, sloping roof tiles will be laid. The reason is that after the contraction and settlement of masonry and mortar are uniform, the inclined roof brick will be laid.
2. When the _ layer wall is built to a height of about 200 from the bottom of the upper beam, build a gap of about 200. The advantage of this masonry method is that it does not need to require accurate gap height to make the new masonry shrink stably, and it will stop in about seven days;
3. Reduce the occurrence of cracks at the joint between wall and beam. The height of this gap is not allowed, and it can only be resisted by solid tiles of about 60.