What does a full package repair include?

1. All-inclusive is also called labor and material contracting, that is, the decoration company or construction team is responsible for the procurement and construction of all main and auxiliary materials.

2. Including main materials:

1) Doors and windows: doors and covers, wardrobe doors, window covers.

2) Cabinets: hoods, cabinets, stoves,

3) Ceramic tiles: cross cards, angular lines, grout, wall tiles, floor tiles, joints Agents, door stones, countertops, baseboards, floor drains.

4) Floor: baseboard, floor, floor companion.

5) Sanitary ware: water hose, shower head, towel bar, toilet, hand basin, faucet, bathroom cabinet, bathroom mirror, bathtub, glass glue.

6) Ceiling: side strips, bathroom heater (ventilation fan), gusset plate, water heater, figure-eight valve.

7) Lamps: ceiling lamps, switches, sockets, lanterns, distribution boxes, leakage protectors.

8) Hardware: clothes hangers, shower curtain rods, door locks, curtain rods, hinges, glass.

9) Wall paint: roller, brush, wall paint, wallpaper, paint.

10) Heating and radiator.

3. Including auxiliary materials: mortar, nails, gypsum board, yellow sand, cement, blockboard, light steel keel, paint brushes, etc.

4. All-inclusive is suitable for owners who are busy at work or don’t understand decoration at all.

The content of this article comes from: "Home Decoration Encyclopedia" by Construction Industry Press