New house floor heating decoration procedure

The family decoration procedures for installing floor heating in new houses are as follows ♂? The plumber enters the site

When the plumber enters the site, people from the heating company should also be present, and the positions of the wall-hung boiler and the floor heating distribution manifold should be determined through consultation. The plumber should pre-bury the cold water, hot water and natural gas under the wall-hung boiler according to the size.

construction of floor heating company

After the plumber completes the construction, the floor heating company personnel will enter the site, and the construction will be carried out after the materials are accepted by the owner. Laying insulation board, reflective film, steel wire mesh, floor heating pipe, connecting distribution manifold, and passing the suppression test, which will be accepted by the owner. Bricklayer's construction

Bricklayer enters the site, fills fine stone concrete as required, and maintains it for 3 days before laying tiles. Installation of wall-hung boiler

After the painter leaves the site to install the wall-hung boiler, the owner applies for natural gas. After natural gas

ventilation, the heating company personnel come to the door to debug normally and explain the use knowledge and precautions to the owner.