When did the Yakou Power Station in Yicheng, Hubei Province start?

On June 5438+1October 65438+1October 9, 2009, the groundbreaking ceremony was held in the preparatory office of Yakou Hydropower Project in Datang Yicheng, marking the official start of Yakou Hydropower Project with a total investment of 2 billion yuan.

Yakou Shipping Hub Project, located in Yakou Village, Denglin Farm, Liushui Town, Yicheng City, Hubei Province, is 56. 14 km away from Cuijiaying Navigation and Power Hub and 63.95 km away from the planned Nianpanshan Water Control Hub, which is a national cascade development plan of Hanjiang River Basin 13. The dam site controls the basin area of 65.438+0.33 million square kilometers, the normal water level of the reservoir is 55.72 meters, the total storage capacity is 699 million cubic meters, and the average annual power generation is 372 million kWh. A third-class lock will be built in the hub, which can pass double-row and double-row 1000-ton ships.