2, cloth reinforcement, diameter 6 mm thread cold-drawn steel wire, @200 square binding.
3. The proportion of concrete (by volume) is 1: 2: 3, in which 1 is cement, 2 is sand, and 3 is gravel not greater than15 mm. ..
4. Sprinkle cement mortar on the floor and water it.
5. Put away the cold-drawn steel wire mesh and concrete, and put the mesh in the middle of the concrete.
6. Flat vibrator; No stone is scattered on the dry ash surface 1: 2. 20mm thick. Smoothing and calendering.
7, the thinnest thickness is not less than 50mm, pay attention to the water to be smooth.
8, pay attention to the edges and corners, parapet, metope should be sprinkled with plain gray surface, to do a good job of splayed feet.
This is the most economical way.
As for the high-cost approach, just say one and you will be cheated.
Haha, good luck.