Painter's labor contract

Party A: (ID number:) Party B: (ID number:) 1. According to the principle of Model Painter's Labor Contract, Party A handed over the project to Party B for construction. Combined with the specific situation of this project, the two sides reached the following agreement: 2. Work content: carpentry: curtain box, ceiling, door eyebrow production and installation, cylindrical wrapping, etc. Plumbers: rectification of pipe troughs, drainage pipes, wiring, water supply pipe troughs and sewer pipes, installation of electrical appliances, faucets, lights, switches, sockets, and on-site power supply pipes (such as installation of dragging plates and temporary lights). Painter: wall surface, top surface and cylinder putty coating, correcting the angle of yin and yang, filling holes, etc. Masonry: repair all trunking, switch holes, ground pouring, wall surface, floor tiles, marble paving, pipeline well making, waterproof and water-retaining experiments. Third, the way of contracting: contract liquidation. 4. The construction period is 20 15 to 20 15. The total duration is calendar days. V. Responsibilities and obligations of both parties Party A: 1. Before the commencement of construction, Party A shall provide Party B with the confirmed construction drawings or practice instructions, make on-site disclosure to Party B, provide Party B with water and circuit coordination needed for construction, explain the matters needing attention in use, and go through various procedures such as application, planning and approval involved in construction; 2. Assign a certain degree of supervision and inspection; 3. Coordinate the organization of each type of work and the construction unit. 4. Be responsible for the approval and disbursement of the project progress. 5. Formulate the project construction scheme and construction progress plan. 6. Be responsible for the examination and approval of material plan and man-hour report. Party B: 1. Participate in the on-site disclosure of construction drawings or practices organized by Party A, and complete the planned construction tasks according to Party A's overall deployment. Those who do not carry out the construction according to the drawings and change their practices without authorization will bear all the responsibilities; 2. Complete the construction within the specified time, and solve all kinds of construction, safety problems and cross-construction coordination that Party B is responsible for; 3. Take out comprehensive insurance for foreign employees according to local requirements, and the expenses shall be borne by Party B; 4. Strictly implement the construction specifications, safety operation procedures, fire safety regulations and environmental protection regulations, and strictly implement the safety and civilized construction regulations on the construction site and the post responsibility system of the team leader (attached). 5. Make attendance records and construction progress of personnel every day, and report to Party A; 6. Abide by the national or local government and Party A's regulations on construction site management, and do a good job in construction site safety and garbage cleaning (manually clean up garbage at sunset every day and transport it to the stacking point designated by Party A). 7. The materials required by each team shall be applied to the site project department in written form 7 days in advance (large materials), and the auxiliary materials shall be applied 3 days in advance. During construction, the materials processed on site should be accurately measured to prevent waste, and once found, heavy penalties should be imposed; 8. The contractor shall strictly abide by the laws, regulations and norms related to safety production management, carefully organize construction according to safety production standards, and take necessary safety protection measures to eliminate all hidden dangers of accidents. If the contractor's safety risk in performance of the contract is increased due to reasons or behaviors other than the contractor, the contractor must immediately take necessary safety protection measures to prevent personal safety or property losses caused to himself, the employer or the third party due to his performance of the contract. If the contractor fails to take necessary safety measures in time, resulting in production safety accidents, all responsibilities shall be borne by the contractor; 9. When the project is not completed, but a finished product has been completed on site, it must be responsible for protecting the finished product on site, and the responsibility shall be borne by Party B. The quality of this project shall conform to the current national quality acceptance standards for architectural decoration engineering, and the quality evaluation and acceptance standards refer to the construction drawings, practice descriptions, design changes, Code for Construction and Acceptance of Architectural Decoration Engineering, Unified Standard for Quality Inspection and Evaluation of Architectural Installation Engineering and other national special construction and acceptance standards; 1. In case of any quality accident caused by Party B, the rework cost shall be borne by Party B, and the construction period shall not be postponed, and Party A shall bear the corresponding losses. Seven. Rights and obligations of both parties A. Rights and obligations of Party A 1. Party A arranges site management personnel for unified and coordinated management, and Party B must obey Party A's site management; 2. Party A has the right to supervise and inspect the construction process of Party B.. If it is found that the construction does not conform to the specifications and design drawings, it shall stop the rework or construction according to the specifications in time. If a quality accident is caused by Party B, Party A will inform Party B in writing of the accident handling opinions according to the nature of the accident, and impose economic penalties on Party B. If the accident is serious, Party B is required to replace the construction personnel or cancel the salary grade of Party B in this project; 3. Party A arranges the living expenses according to the construction progress and quality of Party B, and pays the project expenses according to the payment terms after the project is completed; 4. Party A has the obligation to coordinate the cross-construction problems between Party B and other construction teams, and promptly answer the problems arising from the discrepancy between the drawings and the site; 5. Party A has the right to check Party B's safe and civilized construction at any time. Do not meet the norms and relevant management regulations, depending on the seriousness of the case to give a warning and economic punishment; 6. Party A has the right to make reasonable construction adjustments to Party B's construction tasks and reasonably require the completion of the construction period. Party A has the right to reassign the construction tasks that cannot be reasonably completed. B. Rights and obligations of Party B 1. Obey the unified management of Party A and abide by the relevant rules and regulations of Party A; 2, in strict accordance with the design drawings and related construction specifications, complete the construction task with good quality and quantity; 3. After the sub-project construction and each working procedure are completed, Party B shall conduct self-inspection. If the self-inspection is unqualified, it shall not be transferred to the site of next working procedure. After passing the self-inspection, Party B shall provide the self-inspection record to Party A's on-site management personnel for acceptance, and handle the process handover form to enter the next process; If Party B fails to carry out the construction according to the specifications and operating basis, Party B shall be responsible for the rework, and the labor and material costs arising therefrom shall be borne by Party B. 4. Party B shall formulate a weekly work schedule according to the construction drawings and submit it to Party A at the time specified by Party A for review, and the schedule reviewed, modified and approved by Party A shall prevail; 5. Party B has the right to apply to Party A for the project cost according to the payment terms of the project cost; 6. Party B is responsible for the safety, hygiene, fire prevention, theft prevention and protection of finished and semi-finished products on the construction site. When Party B receives materials at the construction site, it shall receive them as required, so as to ensure that the materials are clear after work and the finished products and semi-finished products are stacked in an orderly manner; Found littering materials, compensation according to the price; Party A has the right to stop and punish acts and accidents that endanger site safety, fire fighting and the protection of finished products and semi-finished products, and the penalty amount is twice the value of the damaged products. Party A will give material rewards to meritorious personnel according to specific conditions; All losses caused by Party B's own reasons shall be borne by Party B, and Party B shall be obliged to educate the construction personnel on safety and self-protection, and Party B shall be fully responsible for the personal injuries and lost work caused by Party B's construction personnel. 9. Party B shall complete the construction tasks undertaken on the principle of reasonable economy and meticulous work, and the approval standard shall be the quota standard issued by the national quota station. If the quota standard is exceeded, Party B shall be responsible for the cost of the excess engineering materials; 10. Party B shall, according to the needs of on-site work, educate the personnel who enter the site on the safety operation norms, and the personnel engaged in special types of work must hold the work license. 1 1. If Party B fails to carry out construction on the construction site according to the construction specifications and operating basis, Party B shall bear all legal and economic responsibilities and notify Party A in time. 12. Party B shall be responsible for cleaning up all wastes and construction wastes on the completed site, and the project cost can only be calculated after being appraised by experienced personnel. Eight. Modification and termination of the contract 1. Party A may terminate the Contract under the following circumstances: 1). The project cannot be continued due to the investor's reasons; 2) Party B fails to carry out the construction according to the drawings, procedures, schedule or rules and regulations formulated by Party A according to law; 3) Party B fails to complete the production (work) tasks stipulated in this contract without reason; 4) When the contract unit price is required to be increased without reason during the construction process, the settlement will not be made, but only after deducting the project connection payment from the receiving team price. 2. Party B may terminate the contract under the following circumstances: 1). Party B is unable to perform the contract due to special circumstances and reaches an agreement with Party A to terminate the contract; 2) The project cannot be continued due to the investor's reasons. IX. Agreement price and adjustment, settlement 1, wage pricing standard; 1), yuan/meter; 2) Yuan/_; 3) For the construction project of RMB /_ 2 3 that is not included in the wage pricing standard, Party A and Party B shall settle it through negotiation according to the market wage; 4. Party A will pay Party B the living expenses according to the progress of the project, accounting for 70% of the monthly project payment, and must attach the workers' salary table when receiving the project payment. The project is qualified according to the relevant national acceptance standards, and shall be paid to 95% after the final accounts are verified by Party A's quantity measurement. The remaining 5% shall be paid in one lump sum without interest within two years after the expiration of the warranty period without quality and maintenance service problems. 5. The handover report shall be signed by the relevant personnel on site and the project manager. 6. The total cost is calculated according to the quantity actually measured by both parties on site. X. Warranty 1. Party B shall guarantee the construction project for 2 years free of charge, and the warranty period shall be calculated from the date of completion, acceptance and delivery of the project; 2. Party B shall carry out maintenance according to the requirements of Party A (within 2 days after receiving the notice). If the maintenance is not timely or there are problems with the maintenance service, Party A has the right to make other arrangements, and the expenses will be deducted from Party B's warranty fund. XI。 Default handling 1. Time limit: Party B unconditionally completes the project on time according to the time limit and requirements notified by Party A in writing, and shall bear a fine of 1000 yuan for each day of delay; If the delay exceeds seven calendar days, Party A has the right to ask Party B to leave unconditionally and bear all losses. If the construction period is delayed due to Party A's reasons, the construction period shall be postponed; 2. Quality: If the quality is unqualified, Party B shall bear the cost of materials and labor for rework, and the construction period will not be postponed, and bear the total cost of this part and 20% of the liquidated damages; Twelve. Dispute Resolution In case of any dispute arising from the performance of this contract, Party A and Party B shall settle it through negotiation in time. If negotiation fails, you can apply to the legal adviser of the branch for mediation; If mediation fails, a lawsuit may be brought to the people's court of this Municipality. This contract shall come into effect after being signed and sealed by both parties. Thirteen. Matters not covered in the supplementary agreement shall be discussed separately by both parties. This agreement is made in duplicate, one for Party A and one for Party B, and shall come into effect as of the date of signature. If there is any ambiguity, a supplementary agreement shall be signed separately, which has the same legal effect as this agreement. Party A (signature): Party B (signature): Date: Date: Security Agreement Party A: Party B: