2. Secondly, tie the main line and the big line together and add a big empty bean between the two knots to reduce the risk of the main line slipping out of the pole slightly. Thread the thread end into the iron wire on the big empty bean, align the folding line, push the big empty bean upward, push the two big empty beans into the ticket seat, continue to push the two empty beans, push the other empty bean at the end in turn, put it into the lead seat, and push the last one to fix the lead.
3. Finally, move the hook and the hook handle forward, slowly wind several times from the hook handle forward, and pull out one end of the thread to install.