Bathroom installation: when is it better to install the bathroom for decoration?

We all know that home improvement is a process from local to unified, and bathroom decoration is an important part of the whole home improvement. In the process of decoration, large furniture and household appliances should be purchased and installed last, but when we install bathroom products, we always don't know which one to install first, so we should introduce you to the correct bathroom installation steps and teach you when to install the bathroom!

When is it better to install the bathroom for decoration?

Many people think that in the whole process of house decoration, sanitary ware is only installed in the later stage of the project. Because it must pass the people's inspection and a series of civil buildings, bathroom space is naturally more important. After the work is completed, sanitary ware will be installed; Related, but professionals pointed out that the purchase of sanitary ware should be determined in the overall decoration style room, but the overall decoration of the home is before the start of construction, because only in this way can the specific installation requirements and technical parameters of the purchased products be used in the construction process; Generally speaking, sanitary ware products from different manufacturers have different requirements for installation conditions, such as the faucet needs to be embedded with suitable pipes, the distance between the drain hole and the wall of the bathroom needs to be considered, and the position of the bearing wall and floor drain of the shower room needs to be considered. These are all necessary in the process of home improvement, otherwise it is difficult to install and use bathroom products.

What is the installation process of the bathroom?

(1) construction process

Mosaic wall tile → suspended ceiling → floor tile laying → installation of toilet, washbasin and bidet → installation and connection of drainage pipe → installation of lamps, sockets and mirrors → installation of towel rack and other hardware accessories.

1. Toilet process

Check the ground drain pipe → align the pipe orifice → calibrate horizontally → draw lines → punch holes → smear putty → set rubber pads → tighten nuts → draw lines behind the holes on both sides of the sink. → Punch holes → Insert bolts → Twist → Align the oil return tank → Screw the nut → Install the elbow of the oil return tank → Install the splayed door → Bend the female light fork → Insert the drift door and splayed door → Tighten the nut.

2. Washball process

Insert the expansion bolt → twist → hang the washbasin pipe rack → put the washbasin on the shelf to find the water level → receive water: washbasin → straighten → receive water.

3. The process of bathtub

Bathtub installation: → launching installation → putty sealing → launching installation → test plate.

4. Shower process

The hot and cold water nozzles are leveled with test tubes → measure the size of the short tube → install it on the nozzle → apply the grease of the faucet on the copper entrance of the shower head → tighten the nut → fix it on the wall → install the upper copper tube on the tee → fix the wooden screws on the wall.

Bian Xiao will talk about when to install bathroom products and all the details of bathroom installation. Therefore, the master suggested that when installing the bathroom, we should mainly look at our progress. There are no strict rules for the installation of toilets, so as long as it is convenient for us, when can we start installing toilets, so it is better to install them later.