Determination of main materials and quality requirements for decoration engineering?

What are the determination and quality requirements of the main materials of the decoration project? The following is a detailed introduction of Zhong Da Consulting for your reference.

Determination of main materials and quality requirements in decoration engineering

(A) the determination of the main materials

1. All materials that have been selected by the design contractor and whose origin, brand and specifications have been specified in the bidding documents shall be selected according to the design requirements in principle. Real samples can only be purchased and used after being submitted for approval and sealed.

2. Mode design If the materials specified in the negotiation documents and design drawings have been changed to substitute products due to reasons such as procurement and delivery time, the physical samples shall be sent to the owner for seal after the design is approved, and then purchased and used after approval.

3. The submitted materials must meet the material quality standards stipulated by the state. If there is no national standard, it must also meet the relevant industry or local standards.

4. The use of ordinary materials should be confirmed by the design first, and then submitted to the owner for approval, and can only be purchased and used after approval.

(2) Quality requirements of main materials

The construction quality target of this project is one-time acceptance, and the quality of all major sub-projects must meet the excellent standards stipulated by Shanghai Construction Engineering Quality Supervision Station. Implement the Code for Quality Acceptance of Building Decoration Engineering (GB502 10-200 1), put forward the following quality perception standards, and control the process construction.

1. Quality standard of light steel keel (ceiling and partition wall).

A the appearance of the boom is straight, without bending or deformation.

B. Filler in the boom: the material is dry, and the laying thickness meets the requirements and is even.

C keel appearance: corner joints are consistent, with smooth surface, no warping, no hammer marks and even joints.

It is surrounded by walls.

2. Quality standard of stone and ceramic tile

A. The surface of the decorative board shall be smooth, clean and of the same color. The seams and filling of decorative panels are dense, straight, wide and uniform in color, and the plates at the corners of yin and yang are pressed, which is not suitable for using whole bricks.

B. Cutting the plate sleeves around the protruding part: the whole brick sleeve is used for cutting and matching, the edges are neat, the top and face of the dado are smooth, and the thickness of the protruding wall is consistent.

Liushuipo and drip line: drip line is straight and Liushuipo is in the right direction.

3. Paint engineering quality standards

Quality standard of tinted paint (advanced paint):

A. flowing wrinkles and skin decoration: no large or small surface.

B. bright and smooth: bright enough, smooth and unstoppable.

C. color separation and edge wrapping: there is no big face or small face.

D. decorative line: the color separation line is straight.

E. color and brush pattern: the color is consistent, and there is no brush pattern.

F. Hardware and glass: clean.

Quality standard of varnish engineering (advanced paint):

A. Wood grain: the brown eyes are scraped flat and the wood grain is clear.

B. bright and smooth: smooth and soft, smooth and unstoppable.

C. Bound, drooping and wrinkled skin: None.

D. color and brush pattern: the color is the same, and there is no brush pattern.

E. Hardware and glass: clean.

4. Quality standard of painting engineering (advanced Bo Tu)

A. powder removal and peeling: none.

B. Missing brush and primer: none.

C. returning to alkali and biting the bottom: none.

D. depressions and papules: none.

E. color and brush pattern: the color is consistent, and there is no sand hole and brush pattern.

F. Straightness of decorative line and color separation line (stay 5m, stay less than 5m): deviation is not more than1mm..

G. doors, windows, tables, etc. : clean.

5. Quality standard of fine wood products

A. Manufacture of fine wood products: the dimensions are correct, the surface is straight and smooth, the edges are square, the lines are straight, the nail cap is not exposed, and there are no defects such as planing, burr and hammer marks.

B. Installation of fine wood products: the installation position is correct, the cutting angles overlap neatly, the joints are tight, straight and smooth, close to the wall surface, and the wall surface size is consistent.

6. Surface grinding quality standard

Surface quality of board surface: the surface is clean, the pattern is clear, the color is consistent, the seam is even, the periphery is straight, and the board has no cracks, corners and gaps.

7. Glass engineering installation quality standard

A. Silica gel filling: silica gel is full, firmly combined with glass and incision, with edges flush with incision, four corners in figure of eight, smooth surface and no cracks, pits and wrinkled skin.

B. Rubber pads or foam strips for fixing glass: the quantity meets the specifications and the specifications meet the requirements.

Wood bar screw: the wood bar is close to the edge of the cutting edge, the cutting angle is neat, the connection is tight, and the nail cap is not exposed.

C rubber cushion inlay: the rubber cushion is closely attached to the cutting edge, glass and batten, neat and consistent, and is not exposed outside the batten.

D. Installation of glass brick: the arrangement position is correct, even and tidy, without displacement, full and dense caulking, and even and straight joints.

E. color embossed glass assembly: colors and patterns meet the design requirements, and the seams are consistent.

F. The surface of glass after installation: clean, free of paste stains, cement slurry, paint and other stains, with front and rear glass, and the installation direction is correct.

8. Wooden door installation engineering quality standard

A. Insulation materials should be filled between the door frame and the wall: the filling should be full and even.

B. Door installation: the cutting is straight, the planing surface is smooth, the switch is flexible and stable, and there is no rebound or warping.

C. Hardware installation: the position is appropriate, the groove beam is consistent, the edge is neat and the size is accurate. The hardware installation is complete, the specifications meet the requirements, the wooden screws are tightened horizontally, and the bolts are flexible to open and close.

D. Installation of water cover, sealing strip, layering and sealing strip: uniform in size, straight and smooth, firmly and tightly combined with doors and windows, and seamless.

9. Wooden door production quality standards

A. Treatment of wood dead joints and wormholes: Dead joints and wormholes with a diameter greater than 5mm should be filled with the same cork and glue. The cork color and wood grain of clear oil products should be consistent with the products.

B surface quality: smooth and flat, without cracks, scars, burrs, hammer marks and missing edges. Clear oil products are similar in color and wood grain.

C cutting, threading, corner cutting and sewing: cutting and threading are straight, the cutting angle is accurate, the coil is neat, the sewing is tight, and there is no glue mark. The color and texture of the two pieces of clear oil products are the same.

D. Brush the primer dry: brush the primer dry evenly after the door is finished.

10. Construction quality standard of coating waterproof layer

A. materials: the varieties of materials must meet the design requirements.

B. Material inspection: Materials entering the site must have factory certificate and quality guarantee, and there must be inspection report of qualified inspection institutions.

C coating quality: the coating waterproof layer must be flat and even, without peeling, bulging and cracks, and firmly bonded with the base.

Coating detection: there is no leakage in water filling test for 24 hours.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd