What is the half-package project?

question 1: what items are included in the half package? Half-package is mainly labor costs and accessories, that is, basic decoration. Different decoration companies include different projects, generally including wall covering, putty scraping, painting for waterproofing, brick laying and flooring. Pay more attention to some details, such as specific terms and conditions, and the unit price of each item

Question 2: What is the half-package? What is the concept of half-package? Half-package is the decoration mode adopted by most owners at present, and other decoration projects are undertaken by the decoration company except the main materials, mobile furniture and electrical appliances. The items included in the half-package quotation generally include: water circuit renovation, wall renovation, wall brick and floor tile paving, ground waterproof engineering, wall base treatment and fixed furniture such as latex paint, doors, door and window covers, ceiling, wardrobe and TV cabinet, TV background and partition modeling, cabinets and installation engineering, etc. Except for the main materials, the labor costs and auxiliary materials of these items are borne by the decoration company.

the main materials not included in the semi-package generally include: floor, tiles, curtains, lamps, sanitary wares, switch panels, etc. These main materials are purchased by the owners themselves, and the decoration company cooperates in paving or installation.

if there is a need for decoration, you can consider the decoration of Juzhong. I hope it will help you!

Question 3: What part of the semi-package is included in the decoration house? Generally speaking, the decoration company is responsible for all the construction and manual arrangement, and its contents are as follows:

responsible for indoor structural transformation (such as tearing down walls or building new walls),

responsible for hydropower transformation construction (water supply and drainage design and installation, circuit design and installation, sanitary ware installation, etc.).

responsible for mud construction (backfilling, ground leveling, waterproof treatment, wall tiles and floor tiles, etc.)

responsible for wood construction (ceiling, modeling and some furniture made on site, etc.)

responsible for paint construction (wall, wallpaper or latex paint, furniture paint, etc.)

Some of the above parts may be installed by vendors, such as sanitary ware. Some if the seller does not package the installation, it should be completed by the decoration company accordingly. But this must be agreed in advance. For example, if the seller doesn't install the wooden floor, you have to make an agreement with the decoration company in advance, and it will be calculated in half package and installed by the company's carpenters.

in addition to the above construction items, the semi-package also includes the procurement of some materials. Mainly include:

cement, river sand, gypsum board, molding board and small miscellaneous parts (such as nails, bolts, all-purpose glue, etc.)

But there are many kinds of these auxiliary materials, which should also be paid attention to in the contract. Generally, it is purchased by decoration companies, otherwise, it is difficult for consumers to find out for themselves and it is also very troublesome.

Question 4: What do you include in the half-package decoration? Just tell you the items that the decoration company does not include: water pipes and wires. Some decoration companies do not include sanitary ware, cabinets, tiles, wood floors, furniture, lamps (living room dining room lights), interior doors and security doors. Everything else is included. All the above contents are paid by you!

Baidu expert He Guangning answers for you. If my answer is helpful to you, please adopt it in time! Your approval is the biggest motivation for me to answer questions! thank you

question 5: which projects are the semi-packaged general decoration companies responsible for? The semi-packaged decoration and decoration companies generally include water and electricity: water pipes and fittings, sewer pipes and fittings, electric conduits and fittings, cassettes, wires and other small accessories. Bricklayer: cement, yellow sand, red brick, caulking agent, waterproof and other small accessories. Woodworking: wooden keel, gypsum board, joinery board, wardrobe cabinet board, decorative board. Nails and small accessories. Oil workers: latex paint, putty powder, gypsum powder, paint, and small accessories. Half-package decoration, independent purchase of ten main materials in the list of main materials 1; Doors and windows: doors and covers, window covers, pass, door suction, security doors, plastic steel doors and windows, folding doors and wardrobe doors. 2; Cabinets: cabinets, hoods, stoves, baskets, vegetable pots, kitchen treasures, water purification equipment. 3; Ceramic tiles: wall tiles, floor tiles, jointing agents, cross cards, corner lines, caulking agents, doorstones, countertops, skirting lines and floor drains. 4; Floor: floor, skirting line, floor partner. 5; Sanitary ware: toilet, hand basin, faucet, water hose, shower head, towel bar, bathroom cabinet, bathroom mirror, bathtub, glass glue. 6; Ceiling; Buckle plate, side strip, bath bully (ventilator), water heater, eight-character valve. 7; Lamps; Lantern, ceiling lamp, switch, socket, distribution box, leakage protector. 8; Hardware; Curtain rod, clothes hanger, shower curtain rod, door lock, hinge, glass. 9; Wall paint; Wall paint, roller, brush, wallpaper, paint.

question 6: what items are included in the half-package of home improvement companies? Except the main material-half a package. The above explanation is very clear

Please accept it, thank you!

Question 7: What do you mean by "half-package" for house decoration, and "half-package" for good home decoration means basic decoration+partial on-site modeling; Big package (also called full package) refers to half package plus main material; The following is my original arrangement.

total cost of home improvement = 1 basic decoration (half package) +2 on-site modeling and production projects +3 furniture +4 main materials +5 soft assembly decorations;

which is better: each has its own advantages: if it's only half a package, the main material should be bought by itself, which may save some money, but it will take a lot of effort;

now, by contrast, the main materials of regular companies, such as the main material package and purchasing mode, are not expensive, and customers are more worry-free and labor-saving;

They are introduced as follows:

1. Foundation decoration project (often referred to as basic installation):

Generally, it refers to the project cost excluding main materials and the overall cost of basic projects such as walls, floors, roofs, water and electricity;

Specifically, it includes: according to the order from the ground to the top, all the labor costs and auxiliary materials costs for paving floor tiles,

all the bottom treatment costs and main materials costs of wall latex paint (or wallpaper) projects plus painting costs;

labor and auxiliary materials fees for all power transformation projects (excluding the materials fees for switch panels and lamps, including installation fees);

all labor and auxiliary materials for water pipeline construction (excluding faucet);

ceiling labor cost, auxiliary material cost and main material cost of kitchen and bathroom;

the material cost for waterproof treatment of kitchen and bathroom wall surface;

new insulation wall; New partition wall; Labor and garbage transportation expenses of all demolition projects;

conversely, furniture and modeling items are excluded, and all construction and installation costs of main materials are removed; Is the basic decoration project; In the past, the basic installation projects included wooden doors, dumb mouths, window covers, heating covers, curtain boxes and other wooden works; Now most of these wood products are produced in factories and then installed on site, so they are not included in the basic installation cost;

2 On-site modeling projects include: floor mosaic in the entrance hall; Screen, decorative shoe cabinet, artistic ceiling (glass luminous ceiling, wooden lattice ceiling, gypsum board modeling, wood veneer modeling, beam modeling, etc.), living room (usually referring to the sum of living room and dining room space) facade main decorative wall; TV background wall; Decorative partition, bar, modeling wine cabinet, etc. Art ceiling at the top; The artistic treatment project, decorative modeling and ceiling of the corridor; Decorate the dumb mouth, the decoration project of the leisure balcony of the hall; Each room's facade bedside background treatment, top surface modeling treatment, ground platform, etc.;

3 furniture includes (furniture that can be made on site by decoration companies from the moment of entering the door): shoe cabinets, wardrobe hanging rooms, dressing rooms (available in large-sized houses), TV cabinets, TV floor tables, art duobaoge, storage partitions, telephone cabinets, wine cabinets, bar counters, cabinets, heating upper cabinets, bedroom lockers, bookcases, bedside tables, balcony lockers, bed cabinets, and so on.

4 main materials include: large floor tiles, kitchen tiles, kitchen wall tiles, installation of all floors and skirting boards, all sets of finished wooden doors and window covers, sanitary ware and bathroom equipment (toilet, shower room, bathtub, basin, column basin, faucet, etc.), and the whole kitchen (floor cabinets, hanging cabinets, countertops, hoods, cookers, disinfection cabinets, water basins, etc.).

5 soft assembly decorations: sofa covers, cushions, table linen, curtains, floor mats, bed curtains, sheets, carpets, murals, facade decorations and furnishings.

looking at the composition of home decoration cost, the above five parts are beneficial to the reference of consumers.

question 8: what does the semi-package decoration include and what should be paid attention to? 1. semi-package 1. semi-package: semi-package is also called cleaning accessories, which means that the main materials are purchased by themselves, such as floors, sanitary wares, tiles, floor tiles, paints, cabinets, locks, hardware, etc. Other accessories are arranged by the construction team, such as sand, nails, cement, etc. It will be harder, but the material quality and budget are easy to control (a way between clearing and semi-packaging). 2. Advantages: Choose the main parts to take the initiative, and buy the main building materials yourself, which is more secure in terms of safety and economy. Auxiliary building materials are rationed by the construction team, which saves a lot of effort in small things. 3. Disadvantages: It takes a lot of time to go to the building materials market, and it is not easy to decorate. When signing the contract, you must clearly indicate which ones are provided by the decoration company and which ones are purchased by the owner himself. Otherwise, it is easy to be exploited by the decoration company in the later stage, making you buy everything, which is very tired and passive. Suggestion: Half-package decoration is suitable for busy people who pursue quality, but the premise is that they must have certain professional knowledge of decoration building materials. 4. Precautions for decoration of semi-package: If the semi-package is operated well, it will bring good decoration effect to everyone, and the space decoration will satisfy us. But if we don't pay attention to a series of problems, it may bring us unnecessary trouble. When adopting the semi-package decoration form, we should pay attention to the following issues: ① Companies recommended by relatives or friends: The decoration companies recommended by relatives or friends are generally reliable, but only if they are knowledgeable. 2. Professional ethics: When referring to other decoration companies, pay attention to the attitude of this decoration company. If you degrade your peers, choose carefully. If you can give a pertinent opinion, you can consider it. ③ Payment method: reasonable payment is made according to the working procedure and written into the contract. After each step of work is completed and the materials and process standards are accepted, the project payment will be paid. If the terms of the contract are less than half of the renovation, and most of the project funds have been paid, choose carefully. Second, all-inclusive: contracting for work and materials, and the construction team is responsible for all material procurement and construction. Advantages: relatively time-saving, labor-saving and worry-free, and clear responsibilities and rights. Once there is a quality problem in the decoration, the responsibility of the decoration company can't be shirked, because they are responsible for the materials, so just look for them directly if there is any problem. Disadvantages: the cost is high. Due to the complexity of material prices and types, decoration households know little about it. Once the decoration company falsely reports the price or cheats the owner together with the material supplier, it is difficult to identify it. Suggestion: All-inclusive is suitable for people who are very busy or have rich economic conditions, because all-inclusive means saving trouble and spending more money. Matters needing attention in the whole decoration package: 1. The strength of the decoration company: whether there is a business license registered by the Industrial and Commercial Bureau, the construction qualification and design qualification issued by the relevant state departments, and whether there is a formal business office. 2. Investigation on the projects constructed by the company: whether the design is reasonable and whether the construction quality meets the requirements. 3, whether there is a special material department to ensure that meet the supporting supply, whether they establish a reliable cooperative relationship with material suppliers, material quality problems can be borne by the company. 4, the presence of construction management departments to supervise the construction quality and progress. Third, cleaning the package-cleaning the package is similar to the "custom installation" when installing the software, which means that the decoration company or the construction team is only responsible for the actual decoration construction, while the design, material selection, material purchase (including the main materials such as tiles and floors and the auxiliary materials such as yellow sand and cement) and acceptance are all completed by the owner. Advantages of clearing the package: 1. The owner has the greatest initiative, and everything is under his own supervision and control, so it is easy to rest assured. 2. Sometimes the houses designed by the owners are more personalized and conform to their own living habits and personality characteristics, especially for those compatriots who have their own design ideas. This is really an exciting challenge experience. 3. Compared with other methods, the price is more economical and easy to control, eliminating the chance of being cheated. Disadvantages of clearing the package: 1. In this way, the workload of the owner will be particularly heavy, and a lot of time and energy will be spent running around. It is impossible to be lazy. 2. It is necessary for the owner to know the professional knowledge of materials and construction, and also to be familiar with the market conditions. Otherwise, it will be easy to buy some materials with high quality and low price, and it will be difficult to cope with various problems raised by the decoration company or the construction team, and in the end it will lose the initiative. So if you are a layman whose decoration thinking is still 1 years ago, don't consider it. It is best to clear the difference between full-package decoration and half-package, and clear the package first. After all, no matter which way you take, you should know the free services that merchants can provide. Maybe these services can help you save a lot of money. Decoration and construction ... > >

question 9: what does a general half-package of home decoration mean? The items included in the semi-package are:

1. The work cost of treating the top and wall base of the living room and bedroom and painting latex paint (shoveling wall skin, scraping putty and brushing latex paint

) and the charging cost.

2. The cost of tiling the walls and floors of kitchens, bathrooms and balconies (paving and jointing) and cement sand

auxiliary materials, excluding tiles.

3. Labor and material costs for waterproof treatment of toilet and red brick-wrapped pipeline (waterproof mortar coating, closed water test, masonry plastering

).

4. Labor cost and material cost of gypsum board ceiling (keel erection, gypsum board sealing and special bandage) in porch and corridor.

5. Installation project (installation of lamps, sanitary ware, glass, locks, curtain rods, hardware pendants, etc.) costs

, excluding items.

6. Material handling and garbage removal (material upstairs fee, daily garbage cleaning with garbage bags and delivery to the designated place of the property

). Hydropower renovation costs are charged according to actual measurement.

question 1: what items are included in the semi-package decoration, and how to charge for the semi-package? 1. Basic engineering

The first thing to pay attention to in the semi-package decoration is the basic engineering. The so-called basic engineering mainly includes the wall and roof construction, etc. In the semi-package renovation contract, the situation before the construction of the basic engineering is generally listed, including what parts need to be renovated and how much the renovation cost is.

2, hydropower renovation

Because hydropower renovation is hidden in the wall, the householder often can't see it, so it is easier for the decoration company to cut corners and make money from it.

3. Construction auxiliary materials

In addition to the above, construction auxiliary materials also need special attention in the semi-package decoration. If you don't pay attention, you will easily fall into the trap of the merchants. Zhengzhou Mingjia Zhishang Decoration believes that the cost of construction auxiliary materials is included in the final cost in the half-package decoration contract.